TOOLS REQUIRED
THIS IS ALL YOU NEED BETWEEN YOU AND A SORE ARM
LITTLE BUDDIES
ALL ESSENTIAL TOOLS
FACESHIELD
THIS PROTECTS THE DEBRI FROM GETTING RUINED FROM MY EYE MATTER
BEFORE INSPECTION
WHY DID THEY LEAVE IT BLANK?
STARTING HOLE
TIP: REMOVE THE DRILL BIT AND GO FROM THE INSIDE TAKE IT EASY USE GLOVES TOO.
LIP
REMOVE FIRST
4 1/2" GRINDER
THEY DID NOT HAVE THESE WHEN I WAS YOUNG
DIE GRINDER STONE
THIS IS GREAT FOR MAKING A FLAT AREA
DIE GRINDER AT WORK
A LIGHT TOUCH IS ALL THAT IS NEED HERE.
NO LIP NOW
DE-BUR AS REQUIRED
DIE GRINDING
MAKE COMPLETE LOOPS TO ENSURE A ROUND OPENING
FILING
TAKE OFF THE TOP BURS THE USE 400 GRIT TO FINISH.
RAT FILE DE-BBUR
MAKE IT PRETTY
HOLE INSPECTION
SEE IF IT IS EVEN
FIT THE SMALL BOLTS ON AND LINE UP
STARTING TO SHAPE UP
FIRST FIT
SEE IF IT WILL FIT AND REMOVE SLOW IF NOT
ALWAYS A HIGH SPOT
SEE HOW MUCH YOU NEED TO GRIND OFF
GRIND WITH A GENTLE TOUCH
STARTWITH GRINDER AND TOUCH -UP WITH DIE GRINDER`
TOUGHEST PART
FINDING THE CENTER IS THE HARDEST MOST ESENTIAL PART
PILOT HOLE
DRILL A 1/8 THRU-HOLE FIRST
17/64 THRU-HOLE
TAKE IT EASY YOUR NOT DOING PRODUCTION HERE
TAPPING THE 8M X 1.25
USE CUTTING OIL; REMOVE TAP CAREFULLY
INSIDE FINISHED VEIW
AH SO NICE!
A FINISHED ONE
DONT THAT LOOK SWEET?

Any ring gear off a Kawi engine can be added to the LF's flywheel for the starter to engage. Lightly tap off the gear from a different flywheel and tap it onto the 80's flywheel until it is flush on the edge. Just remember that once the flwheel is mounted and everything is bolted back together, you can no longer "just remove the flywheel"; the engine must now be pulled